DOWNLOAD PORTFOLIO
SITE MAP
CONTACTS
Find a project
THE COMPANY
Who we are
Where we are
Quality systems
Services provided
Credits
WORK
Architecture
Town and country planning
Building
Restoration
Engineering
Civil Engineering
Hydraulic Engineering
Transport Engineering
Environmental Engineering
Industrial Engineering
NEWS
RESERVED AREA
IngeniumTech (esterno)
IngeniumTech (ufficio)
Pulizia IngeniumDoc (esterno)
Pulizia IngeniumDoc (ufficio)
WORK
Engineering
Industrial Engineering
Agosto 2012
Supervision of works and coordination of site safety at runtime for the construction of a wind farm in San Giovanni Lipioni (CH) with a total capacity of 10 MW
Giugno 2012
Executive project for the construction of a wind farm in San Giovanni Lipioni (CH) of the power of 10 MW
Ottobre 2011
Public presentation of the project for the construction of a wind farm in Porto Torres (SS) of the power of 28 MW
Settembre 2011
Definitive project for the construction of a wind farm in Dogliola (CH) consists of 2 wind turbines with a total capacity of 3 MW
aprile 2011
Construction of electrical connection duct, related works and infrastructure for a photovoltaic field in the municipality of Lanuvio (RM) – Bellavista 2
marzo 2011
Adaptation of CP 120/20 kW Lizzano
marzo 2011
Construction of a photovoltaic plant in the Roccella Jonica municipality (RC), district of Canne, with an electrical output of 2.7 MW
Marzo 2011
Construction of a photovoltaic plant, with an electrical output of 8.9 MW, in the district of Tuscania (VT)
marzo 2011
Final draft for the construction of a photovoltaic field with an electrical output of 1.9 MW, in the municipality of Campli (TE)
febbraio 2011
Construction of a photovoltaic plant, with an electrical output of 1 MW, in the municipality of Serrapetrona (MC)
agosto 2010
Construction of a power line connection from a photovoltaic field, with a total output equivalent to 2.3 MW, to the MT ENEL grid, in the municipality of Lizzano (TA)
Giugno 2010
Construction of power lines to connect five wind-farms to the electric grid in the municipalities of Limosano (CB), Sant’Angelo Limosano (CB) and San Biase (CB) and the associated works and infrastructure
maggio 2010
Construction of power lines to connect two wind-farms, in the municipalities of Pettoranello (IS) and Castelpizzuto (IS), to the electric grid and the associated works and infrastructure